- 1Set up
- 2Tap
- 3Results
Tap time study High confidence
Write the steps of the job, press Start, then tap the big button each time a step ends.
Study settings
Rating helper (Westinghouse system)
Rating is the biggest source of error in a time study. Score the operator on four factors instead of guessing one number.
Allowance builder (ILO-based)
Results
Full table · rating per step
Formulas & sources
Method: continuous stopwatch time study, with the Westinghouse leveling system for rating and ILO-based allowances. Sources: Freivalds & Niebel, Niebel's Methods, Standards, and Work Design (McGraw-Hill); Kanawaty (ed.), Introduction to Work Study, 4th ed. (ILO, 1992); Lowry, Maynard & Stegemerten, Time and Motion Study and Formulas for Wage Incentives (McGraw-Hill, 1940). Sample-size formula: Barnes, Motion and Time Study (Wiley).
Takt time & operators High confidence
How fast you must produce to meet demand, and the minimum operators the work content needs.
Method: takt time from available time and customer demand; minimum operators from total work content. Sources: Rother & Shook, Learning to See (Lean Enterprise Institute, 1999); Rother & Harris, Creating Continuous Flow (Lean Enterprise Institute, 2001).
Line balancing High confidence
One task per line: name, seconds, must-follow. "Must-follow" lists the task numbers that must be done first, separated by spaces (leave blank if none). The tool reorders tasks within those rules to use the fewest stations.
Method: ranked positional weight heuristic for single-model lines. Sources: Helgeson & Birnie, "Assembly line balancing using the ranked positional weight technique," Journal of Industrial Engineering 12(6), 1961. The expected-output figure comes from this site's own Monte Carlo simulation (lognormal task times), not from a published standard.
OEE calculator High confidence (overall)
Overall Equipment Effectiveness for one shift or period, split into availability, performance and quality losses.
Method: Overall Equipment Effectiveness = Availability × Performance × Quality, from Total Productive Maintenance. Sources: Nakajima, Introduction to TPM (Productivity Press, 1988). The unrecorded small-stops field is this site's addition, so that short stops nobody logs are not hidden inside performance.