IE ToolkitToolsAbout

IE Toolkit

Free industrial engineering tools for time study, line design and productivity. Everything runs in your browser.

  1. 1Set up
  2. 2Tap
  3. 3Results

Tap time study High confidence

Write the steps of the job, press Start, then tap the big button each time a step ends.

Study settings
Rating helper (Westinghouse system)

Rating is the biggest source of error in a time study. Score the operator on four factors instead of guessing one number.

Rating: 100%
Allowance builder (ILO-based)
Allowance: 11%

Results

Full table · rating per step
Formulas & sources
Normal time = Avg observed × Rating Standard time = Normal × (1 + PF&D allowance) Req. obs (95% conf, ±5%) = [40·√(nΣx² − (Σx)²) / Σx]²

Method: continuous stopwatch time study, with the Westinghouse leveling system for rating and ILO-based allowances. Sources: Freivalds & Niebel, Niebel's Methods, Standards, and Work Design (McGraw-Hill); Kanawaty (ed.), Introduction to Work Study, 4th ed. (ILO, 1992); Lowry, Maynard & Stegemerten, Time and Motion Study and Formulas for Wage Incentives (McGraw-Hill, 1940). Sample-size formula: Barnes, Motion and Time Study (Wiley).

Takt time & operators High confidence

How fast you must produce to meet demand, and the minimum operators the work content needs.

Minimum, not final. Real headcount is the number of stations after balancing. Task sizes and precedence usually add 0–1 operator. Run Line balancing to confirm.
Available time = (Shift − Breaks) × Shifts Takt = Available time ÷ Demand Planned cycle time = Takt × OEE Min operators = ⌈Work content ÷ Planned cycle time⌉

Method: takt time from available time and customer demand; minimum operators from total work content. Sources: Rother & Shook, Learning to See (Lean Enterprise Institute, 1999); Rother & Harris, Creating Continuous Flow (Lean Enterprise Institute, 2001).

Line balancing High confidence

One task per line: name, seconds, must-follow. "Must-follow" lists the task numbers that must be done first, separated by spaces (leave blank if none). The tool reorders tasks within those rules to use the fewest stations.

Method: ranked positional weight (task time + all tasks that follow it), filled station by station within precedence. Balance efficiency = Σ task time ÷ (Stations × Cycle time) Expected output: 2,000 simulated cycles of a paced line without buffers, each task varying by the CV.

Method: ranked positional weight heuristic for single-model lines. Sources: Helgeson & Birnie, "Assembly line balancing using the ranked positional weight technique," Journal of Industrial Engineering 12(6), 1961. The expected-output figure comes from this site's own Monte Carlo simulation (lognormal task times), not from a published standard.

OEE calculator High confidence (overall)

Overall Equipment Effectiveness for one shift or period, split into availability, performance and quality losses.

Trust the OEE number more than the split. Overall OEE only depends on good units, ideal cycle time and planned time. The availability/performance split depends on how well stops are recorded. Use the measured ideal cycle time, not nameplate speed.
Availability = (Planned − Downtime − Small stops) ÷ Planned Performance = (Ideal cycle × Total units) ÷ Run time Quality = Good units ÷ Total units OEE = A × P × Q = Good units × Ideal cycle ÷ Planned time

Method: Overall Equipment Effectiveness = Availability × Performance × Quality, from Total Productive Maintenance. Sources: Nakajima, Introduction to TPM (Productivity Press, 1988). The unrecorded small-stops field is this site's addition, so that short stops nobody logs are not hidden inside performance.