About
I'm Rohit Pawar, an industrial engineer working in automotive vehicle launch, with an MS in Industrial Engineering from the University of Texas at Arlington. I built these tools because the everyday math of industrial engineering still lives in scattered spreadsheets and stopwatch apps.
This is a free, personal learning project. It is not affiliated with, endorsed by, or built for any employer, and it has no ads, paid features or sponsors.
How the tools were tested
Each tool was run against simulated operations (OEM assembly, tier suppliers, machining, food, electronics and furniture plants) and compared with a more detailed simulation that adds real-world effects: operator pace, tap reaction error, rating judgment, interruptions, task precedence and task-time variation. Tools that fell short were rebuilt and retested.
- Time study: tap timing error was about 2%; most remaining error comes from the performance rating, which is why the rating helper exists.
- Line balancing: matches a ranked-positional-weight balance and forecasts real output within about one percentage point.
- OEE: overall OEE is exact for your inputs; the split between availability and performance depends on how well small stops are recorded.
Use responsibly
Results are planning estimates. Validate them against your site's engineered standards and safety rules before acting on them.
Contact
Feedback and tool ideas are welcome on LinkedIn.